Back office for demolition & excavation
Disconnects verified in writing before any demolition
Pre-construction site services — selective demolition, small-structure teardown, excavation and grading, drainage correction, and survey staking — run as a compliance-heavy workflow with hard gates before any work begins.
Configured for Demolition & Excavation
Not generic software. Your trade's operating system.
The configured workflow pack covers site assessment and compliance gating through top-down demolition and debris sorting, graded excavation with compaction, and documented, grade-verified closeout.
Hard compliance gates
Asbestos surveys, permits, 811 locates, and written utility disconnects are gates in the workflow — no demolition until disconnects are verified in writing.
Disposal as a line item
Disposal is its own invoice line item on weight-based reality, with receipts attached to the final invoice — never buried in a lump sum.
Allowance-based unknowns
Rock, buried debris, and hazmat are quoted as documented allowances with caps, settled on actuals — never promised as fixed.
Your workflow pack
Every phase configured before you log in.
Your back office ships with these phases built for Demolition & Excavation — tasks, checklists, and QA gates included.
Intake & Scheduling
Structure type and age, scope, materials, and access are captured with photos; pre-1978 structures are flagged for an asbestos survey at intake.
Quote & Approval
Per-project quote with disposal as its own line item; rock, buried debris, and hazmat as documented allowances with caps — never fixed guesses; firm only after the site visit.
Demolition
Utility disconnects verified in writing, asbestos survey confirmed clear, dust barriers and site fencing set, then selective top-down demo with debris sorted, hauled, and a magnet-check for nails.
Site Work
Topsoil stripped and stockpiled for reuse; rough grade to plan elevations with compaction in lifts; drainage and swales installed per plan; final grade stabilized with seed and mulch.
Survey & Layout
Control points set; building corners and offsets staked; elevations marked with a laser level; utilities and protected areas flagged; the staked layout photographed for the record.
QA & Closeout
Compliance evidence retained — asbestos survey, disconnect letters, 811 ticket, disposal receipts; grade verified by water test; site clear of debris and nails.
Invoicing & Review
Milestone or completion invoicing with disposal receipts attached; recurring seasonal grading and drainage contracts billed per terms; maintenance offer and review request.
Quoting, our way: Per-project bids with disposal as a separate line item and rock, debris, and hazmat as capped allowances settled on actuals. Utility-disconnect and permit timelines are stated as schedule drivers, not guarantees.
How a job flows
From first call to paid invoice.
Describe the site
Customers submit structure age, scope, photos, and access notes — including how old the structure is.
Site assessment
A walk of the property reviews structure age and materials, adjacent properties, and equipment access; pre-1978 means an asbestos survey is required — stated plainly.
Written scope
A line-item proposal with disposal as its own line item, the permit, asbestos, and utility compliance checklist, and a realistic timeline driven by disconnects and permits.
Pre-work compliance
The asbestos survey is completed and clear; utility disconnect and cap letters are obtained in writing; the 811 locate is done; permits pulled; erosion control and fencing placed.
Work days
Neighbors get a dust and noise courtesy notice; demo proceeds top-down with debris sorted for recycle or divert; excavation is graded to plan with compaction in lifts.
Completion and records
Debris hauled and the site graded and stabilized; the final invoice includes disposal receipts; asbestos surveys and disconnect letters are provided to the customer for their records.
Proof on every job
Evidence your customers can see.
Every Demolition & Excavation job carries photo and documentation standards — dispute prevention built into the workflow.
- ✓ Utility disconnect verification in writing before any demolition
- ✓ Asbestos survey on file for pre-1978 structures, with compliance evidence retained 7 years
- ✓ Before-and-after site photos plus staked-layout photos before handoff
- ✓ Disposal receipts attached to the final invoice
- ✓ Grade verified by water test — water flows away from structures and neighboring properties; site clear of debris and nails after a magnet sweep
Our boundary, stated plainly: We never state hazmat conclusions without testing — pre-1978 structures get an asbestos survey every time, before any demolition.
Pricing
One recovered job a month pays for it.
Your Deputy tiers for Demolition & Excavation: Per-project bids with disposal as a separate line item.. Same platform, configured for how demolition & excavation work gets billed.
Launch
Owner-operators & 1–2 person shops
$499 one-time onboarding · $1,790/yr annual
- Branded client portal on your subdomain
- Online booking page + Demolition & Excavation intake form
- Digital quotes/proposals with e-sign
- Invoices + online payment
- Review engine (auto requests after paid jobs)
- 1 niche workflow pack
- Unlimited staff seats
- Email support
Growth
Growing shops with crews (3–15 people)
$999 one-time onboarding · $2,990/yr annual
- Everything in Launch, plus:
- Full niche OS: dispatch board, crew mobilization checklists, arrival/departure logging
- Automations: quote follow-up drip, past-due dunning, QA gates, seasonal re-engagement
- Crew checklists & SOP library
- Reputation + referral engine
- Service recovery: callback, billing & warranty inboxes
- Subcontractor packet: credentials, availability, offboarding
- Priority support
Scale
Multi-crew / multi-territory operators
$1,499 one-time onboarding · $5,490/yr annual
- Everything in Growth, plus:
- Territories & capacity rules, resource reservations
- Advanced reporting: weekly reconciliation, monthly acceptance review
- Custom integrations (webhooks to your tools)
- Quarterly ops review with us
- Dedicated success contact
End of shift
Your competitors are one missed call away from your customer.
Put your back office on autopilot. Complete the intake, take a 45-minute launch call, and we handle the build from there.
Illustrative sample report — what your end-of-day looks like with Your Deputy on the job.